-
Posted: 2014/05/18 | Categories: FAQ
Compress the hammer adapter onto the post, keep it vertical, install the drill rod with a hammer, target the hammer exactly to the hammer adapter and press it solidly.
Replacement of hydraulic hammer: ...
-
Posted: 2014/03/10 | Categories: FAQ
For the detritus or hard road surface, apply the 330 mm hammer or 260 mm hammer. The 230mm is suitable for the regular road surface.
...
-
Posted: 2014/01/05 | Categories: FAQ
Whether the road surface is curve or not makes no difference.
...
-
Posted: 2013/12/03 | Categories: FAQ
By default the machine is not equipped with function of GPS ,but we can provide customization service.
...
-
Posted: 2013/11/02 | Categories: FAQ
For the general case, the pile driver can pile 1 post every in 1~2 minutes according to road condition.
...
-
Posted: 2013/10/16 | Categories: FAQ
Both electric starting and hand-cranking can start the pile driver.The pile driver is manually operated.
...
-
Posted: 2013/09/21 | Categories: FAQ
Manually regulate the lead screw according to the steepness of slope.The screw head is must be perpendicular to horizontal line.
...
-
Posted: 2013/08/15 | Categories: FAQ
The wheel-type is suitable for flat road while the crawler-type is suitable for rugged roads and mountain slopes.
...
-
Posted: 2013/07/02 | Categories: FAQ
The brand of engine is CHANGCHAI L24.
The power rate is 17 kw, the rotate speed of it is 2200 r / min.
The fuel adopted is diesel.
...
-
Posted: 2013/06/05 | Categories: FAQ
The type of post it pile should match the shape of hammer adapter: Pile C, H, and Sigma post matching with the square hammer adapter, while pile round post matching with the special round hammer adapt ...