Full hydraulic core drilling rig is a highly efficient and versatile drilling machine, primarily designed for drilling solid mineral deposits while also being applicable to a variety of engineering and geological drilling projects.
Specifications:
Model | JY600 | JY800 | JY1000A | JY1000B | JY1600A |
---|---|---|---|---|---|
Drilling depth | BTW: 650m | BTW: 1200m | BTW: 1400m | BTW: 1400m | BTW: 1800m |
NTW: 600m | NTW: 100m | NTW: 1200m | NTW: 1200m | NTW: 1600m | |
HTW: 300m | HTW: 800m | HTW: 1000m | HTW: 1000m | HTW: 1200m | |
/ | PQ: 600m | PQ: 800m | PQ: 800m | PQ: 1000m | |
Hydraulic system( Rated pressure (Mpa)) | Primary pump 95ml/r.32MPa | Primary pump 95ml/r.32MPa | Primary pump 115ml/r.32MPa | Primary pump 115ml/r.32MPa | Primary pump 145ml/r.32MPa |
Auxiliary pump 80ml/r.25MPa | Auxiliary pump 80ml/r.25MPa | Auxiliary pump 80ml/r.25MPa | Auxiliary pump 80ml/r.25MPa | Auxiliary pump 80ml/r.25MPa | |
Cooling method | Air cooling | Air cooling+ Water cooling | Air cooling + Water cooling | Air cooling + Water cooling | Air cooling + Water cooling |
Diesel engine | Yuchai engine 4-cylinder 92kW | Yuchai engine 6-cylinder 92kW | Weichai 6-cylinder 129kW | Weichai 6-cylinder 129kW | Weichai 6-cylinder 147kW |
Rated power (kW) | 92 | 92 | 129 | 129 | 147 |
Rated speed (rpm) | 2200 | 2200 | 2200 | 2300 | 2300 |
Drill head | Max torque: 1400 N.m | Max torque: 1800 N.m | Max torque: 1800 N.m | Max torque: 2600 N.m | Max torque: 3500 N.m |
Max.rotation speed (rpm): 1400 | Max.rotation speed (rpm): 1400 | Max.rotation speed (rpm): 1400 | Max.rotation speed (rpm): 1400 | Max.rotation speed (rpm): 1400 | |
Stroke: 1.8m | Stroke: 1.8m | Stroke: 2.5m | Stroke: 3.5m | Stroke: 3.5m | |
Lifting force: 240kN | Lifting force: 300kN | Lifting force: 360kN | Lifting force: 360kN | Lifting force: 400kN | |
Feeding force: 120kN | Feeding force: 150kN | Feeding force: 180kN | Feeding force: 180kN | Feeding force: 200kN | |
Wireline Winch | Roller capacity: 800m | Roller capacity: 1000m | Roller capacity: 1200m | Roller capacity: 1200m | Roller capacity: 1600m |
Lifting force: 15kN | Lifting force: 20kN | Lifting force: 24kN | Lifting force: 24kN | Lifting force: 31kN | |
Lifting speed: 110m/min | Lifting speed: 110m/min | Lifting speed: 110m/min | Lifting speed: 110m/min | Lifting speed: 110m/min | |
Rope dia.: 6mm | Rope dia.: 6mm | Rope dia.: 8mm | Rope dia.: 8mm | Rope dia.: 8mm | |
Drill Mast | Height: 6.1m | Height: 6m | Height: 6.6m | Height: 8.5m | Height: 8.5m |
Drilling angle: 45-90° | Drilling angle: 45-90° | Drilling angle: 45-90° | Drilling angle: 45-90° | Drilling angle: 45-90° | |
Slide stroke: 800mm | Slide stroke: 1200mm | Slide stroke: 1200mm | Slide stroke: 1200mm | Slide stroke: 1200mm | |
Pipe Clamp | BQ/NQ/HQ/PQ | Max through-hole dia.: 146mm | Max through-hole dia.: 146mm | Max through-hole dia.: 146mm | Max through-hole dia.: 146mm |
Crawler Chassis | Climb angle: 20° | Climb angle: 20° | Climb angle: 20° | Climb angle: 20° | Climb angle: 20° |
Max speed: 2 km/h | Max speed: 2 km/h | Max speed: 2 km/h | Max speed: 2 km/h | Max speed: 2 km/h | |
Mud Pump | BW100 | BW100 | BW100 | BW160 | BW160 |
Dimension (mm) | 4500x1900x2300 | 4600x1900x2650 | 5600×2100×2800 | 5600×2200×3000 | 5600×2200×3050 |
Weight (t) | 4.6 | 6.5 | 6.8 | 8.8 | 10 |
Partial Structure Display
![Full Hydraulic Core Drilling Rig Partial Structure](https://roadskyguardrail.com/wp-content/uploads/2025/02/Full-Hydraulic-Core-Drilling-Rig-Partial-Structure.jpg)
![Full Hydraulic Core Drilling Rig Partial Structure](https://roadskyguardrail.com/wp-content/uploads/2025/02/Full-Hydraulic-Core-Drilling-Rig-Partial-Structure-2.jpg)
Applications
This drilling rig is primarily designed for the exploration of solid mineral deposits, providing reliable and efficient drilling performance in various geological conditions. In addition to mineral exploration, it is also suitable for a wide range of engineering applications, including:
- Geological and Engineering Surveys – Used for engineering geological investigations, foundation exploration, and geotechnical assessments.
- Energy Resource Drilling – Suitable for shallow oil and natural gas extraction, facilitating resource exploration.
- Water Well and Groundwater Exploration – Efficiently drills wells for groundwater extraction, ensuring a stable water supply.
- Tunnel and Underground Construction – Plays a key role in tunnel ventilation and drainage, enhancing safety and stability.
- Dam and Infrastructure Projects – Utilized for grouting applications in dam reinforcement, foundation stabilization, and soil improvement.
Contact Us for a Free Quote
Fill The Form Below, and our sales representatives will be in touch with you shortly.